Lineman working with a wire rope hoist on a 380-kV long-distance line owned by the 50Hertz transmission system operator, track cables are being pulled from one pylon to the next, these cables will be used later to install the actual electric track cables, linemen sitting on the power poles are taking on the cables, Gudow, Schleswig-Holstein, Germany, Europe

px px dpi = cm x cm = MB
Details

Creative#:

TOP13077820

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

Yes

Property Release:

No

Right to Privacy:

No

Same folder images:

Same folder images