Construction site of the ITER fusion reactor, France. At a depth of 17 meters, the concrete apron, the retaining walls and the seismic studs of the seismic isolation pit are in place. By filtering the accelerations of the ground in the event of a seismic event, they will protect the buildings and the equipment of the installation. It is located in the immediate vicinity of the Cadarache nuclear study center in Saint-Paul-lez-Durance, Bouches-du-Rh擛頡, France.

px px dpi = cm x cm = MB
Details

Creative#:

TOP27900765

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

N/A

Property Release:

N/A

Right to Privacy:

No

Same folder images:

Same folder images